Water pretreatment at Gustav Wolf, PCA water

PCA designed and build an installation for the treatment of waste water at Gustav Wolf. In addition, we provided the cooling water circuit and installed everything necessary to distribute the groundwater throughout the factory.

water treatment plant

A well-known customer contacted PCA for the construction and assembly of a new water treatment installation. Smart systems wanted to double its production and counted on us to deliver an installation capable of purifying 4 m3/h of waste water.

 

waste water treatment

PCA has provided a new and comprehensive waste water treatment for the AluK plant located in Chepstow (Wales). The new water treatment plant was necessary because of the addition of a lacquering line with chemical pre-treatment within the company. The result is a fully automated and sustainable waste water treatment plant which is capable of purifying 9m3/h of waste water

For the construction of their new pre-treatment line (vertical SAT tunnel + immersion booths) a considerable flow rate of demineralised water was required as well as a large wastewater treatment. Both challenges were entirely in-house developed, produced and delivered by PCA.