References

Water pretreatment at Gustav Wolf, PCA water

PCA designed and build an installation for the treatment of waste water at Gustav Wolf. In addition, we provided the cooling water circuit and installed everything necessary to distribute the groundwater throughout the factory.

Zero discharge of waste water at Corradi, PCA

PCA designed a tailor-made water purification system for Corradi that combines a vacuum evaporator with an ion exchanger in a closed circuit. This results in a zero discharge of waste water.

water treatment plant

A well-known customer contacted PCA for the construction and assembly of a new water treatment installation. Smart systems wanted to double its production and counted on us to deliver an installation capable of purifying 4 m3/h of waste water.

 

waste water treatment

PCA has provided a new and comprehensive waste water treatment for the AluK plant located in Chepstow (Wales). The new water treatment plant was necessary because of the addition of a lacquering line with chemical pre-treatment within the company. The result is a fully automated and sustainable waste water treatment plant which is capable of purifying 9m3/h of waste water

For the construction of their new pre-treatment line (vertical SAT tunnel + immersion booths) a considerable flow rate of demineralised water was required as well as a large wastewater treatment. Both challenges were entirely in-house developed, produced and delivered by PCA.

When building a new line for the chemical pre-treatment and powder coating of aluminium profiles, the company Wilms (Meerhout) chose PCA to handle its water management. The objective was to eliminate any waste water.